Thursday, September 11, 2014


Socks! O.k. well just one and the ends aren't even tucked in.  I adjusted the numbers from the blue socks and this one fits even better.  I started the second one.  The stripes won't match but that won't bother me for these. I did 60 stitches for most of the foot but about an inch before the heel I increased.  I also went back to US size 1 for the cuff after the size 2 on the leg.  The next pair I have even more modification plans.  The fist one is to start the toe (I like toe up) at the join between two colors.  You will get a small stripe of the previous color but the rest should be a full stripe.  The other thing is to use the other end of the yarn for the heel so the stripes run correctly on the front of the sock.  I'm going to use these modifications and start the "Don't Cage Me In" socks that all the size testing has been for.  I'm excited.  I'm still working on the totoro but I didn't make much progress since I was finishing the sock.

Yesterday I played WOW. I deleted my glitchy character and made another with the same name.  Hopefully this will turn out better.  Everyone made a little progress.  I played WOW today too so tomorrow will be a kdrama day.

Yesterday I finally felt like I got everything done I needed to.  I feel like I'm going in the right direction for the exercise and cleaning.  I need to clean a little harder because they are having an inspection next week.  I think this weekend will be a scrubbing weekend,  I don't think I have anything else interesting to say so I'll see you next time.

No comments:

Post a Comment